The project required a pipeline to transport produced fluid from the Ngongui-1 well platform (NG-1) on a lagoon island to the main facility. Because the lagoon is a critical water resource and a protected fishing zone, minimal environmental impact during installation and corrosion resistance were key requirements.
The advanced OTP pipeline system fully met all the client's requirements. Supplied on reels in long single lengths for fast delivery, the pipes cut installation time by 60% compared to traditional steel pipes. The system easily accommodated the uneven lagoon seabed terrain and satisfied all technical requirements for aquatic protection. Engineers supervised the installation, successfully delivering two pipelines (4-inch and 6-inch at 16 MPa) with a total length of 29 km within a tight schedule. Completed in early 2026, the pipeline has been operating well to date.