The Local Applied Area is one of the most densely populated regions in the area, where urbanization has fully encroached upon the liquid hydrocarbons company’s production blocks. For blocks nearing the end of their crude Hydrocarbon production lifecycle, the liquid hydrocarbons company faces numerous challenges, including environmental damage caused by corrosion of existing metal pipelines, controlling the costs of land and road acquisition, the need for rapid deployment, and the need to reduce installation costs. For this liquid hydrocarbons and gas gathering pipeline network renovation project, the liquid hydrocarbons company ultimately selected the SAFDAL RTP pipeline system.
Through meticulous on-site surveys, SAFDAL engineers proposed an optimized installation design for a total of 20 pipelines spanning approximately 13,000 meters. The plan incorporated technical solutions such as road crossings, directional trenchless construction beneath building complexes, and in-situ intercalation repair of the existing metal pipelines. After obtaining approval from the liquid hydrocarbons company, SAFDAL engineers led their trained and certified construction team to successfully execute the installation plan. Ultimately, the project duration was reduced by one-third compared to the original schedule, and construction costs were lowered by 35%. This project has become a model initiative for the liquid hydrocarbons company’s liquid hydrocarbons and gas gathering and transmission pipeline network upgrades.